Between a request that gets an answer in two days and one that sits still for a week, the difference is almost never the workload: it is what arrives together with the drawing. Here is what our technical office needs to assess feasibility and reply without having to call you back three times.
The four pieces of information that start the assessment
A quote is a forecast of lead times, set-ups and inspections. To make it, four things are needed, and none of them is optional.
- The material, with its full designation. “Stainless steel” is not enough: everything changes between an AISI 304 and a 316L, both in machining and in welding.
- Quantities and rhythm. A single part, ten parts or a thousand parts a year lead to different set-up choices, and therefore to different prices.
- The tolerances that really matter. They are almost never needed on every dimension: indicating which ones are critical avoids paying for precision where it is not needed.
- The final treatment. Painting, blasting, galvanising or nothing: it affects lead times and costs as much as the machining.
The formats we read without conversions
The best format is still native or neutral 3D accompanied by a dimensioned 2D drawing. In practice:
- STEP for the 3D geometry: we open it directly in programming;
- DWG or DXF for the 2D;
- PDF for the 2D, with dimensions, tolerances and all machining notes.
A scanned PDF or a photo of the drawing can be read, but the dimensioning has to be rebuilt by hand, and this lengthens the reply.
If there is no drawing yet
It happens often, especially with spare parts. A physical sample, a photo with a dimensional reference next to it and a description of where it is fitted are enough to start: we put the drawing in order ourselves during the design stage.
The information that is usually missing
Three details that are taken for granted and that instead cost days:
- The destination sector. Aerospace, railway, marine or automotive bring different documentary requirements, and the cost of those documents must go into the quote from the start.
- Who signs off the inspection. If a dimensional report, a material certificate or a complete PFC is needed, it must be known beforehand, not at delivery.
- The date it is needed by. “As soon as possible” is an incomplete formula. A real date makes it possible to say immediately whether it is realistic.
How to send them
From the form on the Contact Us page you can attach the files directly, even more than one. If the package is heavy, a link to a shared folder is fine too. In both cases the feasibility assessment is free and without obligation: if the part is not suited to our machines we say so immediately, avoiding pointless waits.