Batch traceability: what stays on record, from raw material to delivery

Material certificate, dimensional report, welding log: the documents that travel with a delivery, and what they are really for on the day something goes wrong.
Corsia del magazzino con materiali in scaffale

As long as everything goes well, documentation looks like red tape. It matters on the day a component behaves strangely after two years in service and you need to work out whether the problem is the material, the machining or the assembly. If the documents are not there that day, the answer does not exist.

Where the chain starts

Traceability begins at goods-in, not at dispatch. When the material arrives, three things are checked: that the certificate states the expected composition, that the dimensions are the ones ordered, and that the batch is identified so that it cannot be confused with the others in the warehouse.

From there on, that batch number travels with the part. It is the thread everything else hangs on.

The four documents that count

  • Material certificate. Issued by the steelworks, it states the chemical composition and mechanical properties of the heat. It is the one document we cannot produce ourselves: either it exists or it does not.
  • Dimensional report. The critical dimensions measured on the finished part, with the instrument used and who took the measurement.
  • Welding log. Who welded, with which qualified procedure, on which joint. In regulated sectors it is mandatory.
  • Declaration of conformity. The document that ties the delivered batch to the order and to the agreed specifications.

When non-destructive testing is needed

On critical joints a visual check is not enough, and non-destructive tests are added, with their own report. This is an item to agree at the quotation stage: added afterwards, it costs more and takes longer.

Inspection is not only at the end

A final inspection that finds an error born three stages earlier is an inspection that arrived late: the part already has to be remade. That is why checks are spread along the cycle, at four moments: incoming materials, self-inspection during machining, final verification and documentary close-out.

The operator’s self-inspection is the part that is least visible and stops the most errors: the person at the machine measures while working, not when finished.

What to ask for when ordering

Three requests to put in writing in the order, not in the phone call:

  • which documents accompany the delivery;
  • which dimensions go into the dimensional report;
  • how long the supplier keeps the records.

Three lines that cost nothing and are worth a great deal on the day they are needed. Our inspection process, stage by stage, is described on the Certifications page.

Have a project to assess?

Send us your drawings: our technical office assesses feasibility and replies with a detailed quote.

Request a quote

Keep reading

Supporto meccanico lavorato di precisione su fondo blu

How to prepare a technical drawing to get a quick quote

What our technical office really needs in order to reply quickly, and which missing details stretch the response time of a request.
Tornio CNC orizzontale nell'officina BOLT

Vertical integration: what changes when the whole production cycle is in-house

Design, machining, welding and painting under the same roof: what it really means for buyers, beyond the slogan.
Saldatore al lavoro su un telaio metallico, scintille

EN 15085: what the standard requires of a welding supplier for the railway sector

Qualified personnel, written procedures, a responsible coordinator and a record that stays. Why, in rolling stock, welding certification is not a sticker.